Construction Cost Estimating

Precise Estimates. Faster Bids. More Wins.

RK Estimating turns your plans into a CSI-organized takeoff, so your numbers are ready before the bid clock runs out.

15+Trades Covered
24CSI Divisions
100%Itemized Reports
AnyFile Format
$2.2T
US construction industry, 2025
24
CSI divisions covered
15+
trades estimated

The estimate is where most bids are actually lost

Not because the price was wrong, but because it arrived too late, or a line item got missed and turned into a change order later. Closing that gap is the whole job.

Services

Estimating coverage across every division

Every deliverable is broken out by CSI MasterFormat division, ready to drop straight into your bid.

Cost Estimation

Quantities priced against current material and labor benchmarks.

Bid Preparation

A complete, itemized package built to your bid deadline.

Value Engineering

Alternatives flagged where they cut cost without cutting quality.

Divisions

Organized the way you bid

A sample of the 24 CSI divisions covered — browse the full list any time.

01General Requirements 02Existing Conditions 03Concrete 04Masonry 05Metals 06Wood, Plastics & Composites 07Thermal & Moisture Protection 08Openings 09Finishes 10Specialties + 14 more
View all 24 divisions
Trades

Or find it by trade instead

Searching the way a contractor actually searches, not by CSI number.

Electrical Plumbing HVAC & Mechanical Concrete Masonry Framing & Carpentry Drywall & Finishes Roofing Painting + 4 more
View all trades
Methodology

Estimating methods matched to your project

Different projects call for different approaches. We pick the method that fits the scope, not a one-size-fits-all template.

Method 01

Bottom-Up Estimation

The project is broken into small parts, each priced individually, then combined into a total.

Method 02

Top-Down Estimation

Total budget and timeline are set first, then allocated across activities by significance.

Method 03

Unit Price Estimating

Cost per unit of work, ideal for repetitive scope like flooring or paving.

Method 04

Area & Volume Estimating

Early-stage costs derived from square footage or cubic volume.

Method 05

Parametric Estimating

Historical cost data applied against key project parameters.

Method 06

Assembly & System Estimating

Costs grouped by building assembly rather than individual material line.

Process

Plans to numbers in three steps

1

Upload your plans

Drawings and specs, any format, any project size.

2

We build the takeoff

Every applicable division measured and priced, checked twice against your plan set.

3

Get your numbers

An itemized estimate lands in your inbox, sorted and ready to submit.

Why RK

Built for contractors who need it right, not just fast

24/24
CSI divisions covered on every job

Bid-ready formatting

Every line item pre-sorted by CSI division, nothing to reformat before you submit.

Built for your deadline

Turnaround timed to your submission date, not the other way around.

One team, every trade

No juggling separate quotes from five different specialists on one job.

Works with what you send

Clean CAD files or a photo of a hand-marked sheet, either way, it gets taken off.

Get a Quote

Working against a bid deadline?

Upload your plans and we'll turn around a full, itemized takeoff before you need it.

Request a Quote